An RCA and Action Plan to achieve smooth Kiln Feed
Problem Statement: The belt bucket elevator (BBE) feeding the kiln is getting swayed during operation , leading to operational instability, potential mechanical damage, and interlock tripping. Objective: To achieve stable, variation-free kiln feed , ensuring the belt bucket elevator runs smoothly without sway , and preventing unnecessary shutdowns and mechanical failures. Action Plan: Step 1: Immediate Running Condition -> Controlled Operation Bypass the tripping interlocks temporarily, but keep the elevator under strict manual supervision. Continuously monitor the elevator's operation during this period. Manually adjust the elevator through tensioning device until relative stability is achieved. Restore interlocks once the system behavior is stable and predictable. Step 2: Inspection of Material Discharge to Elevator Check material discharge ...